Project Title: Lake Burnt Mills Dam Safety Modifications Contract Number: Not Applicable Location: Suffolk, VA Date of Construction Services: 2006 -2008 Construction Value: Contract Amount $11,900,000.00 Type of Contract: Fixed Price Project Description: This project involves the reconstruction and extension of the Lake Burnt Mills Dam. Project involved extensive demolition, approximately 4000 CY’s of concrete (much of which was Mass Concrete pours), reconstruct dam and spillway structure, Concrete slope paving, Installation of approx. 800 lineal foot of Permalok Steel pipe by micro-tunnel method, extension of the concrete parapet wall elevation and lengthwise, create earthen dam, five (5) large cofferdams, 14” x 14” concrete pre-stressed piles, construct intake tower with four (4) 42” sluice gates trash racks, stop logs, and access walkway. Construct concrete outfall structure with Rip Rap, dredging, earthwork, two (2) boat ramps, fabrication, parking lot, paving, concrete pavers, handrail guardrail, permanent fencing, landscaping.
|